The Big Smith News Watch

Main Menu

  • Home
  • News
    • Traffic
    • Regional
    • International
  • Politics
  • Government
    • Housing
    • Agriculture
    • Natural Resources
    • Public Infrastructure
  • Business / Travel
  • Sports
  • Letter
  • Contact Us

logo

  • Home
  • News
    • Traffic
    • Regional
    • International
  • Politics
  • Government
    • Housing
    • Agriculture
    • Natural Resources
    • Public Infrastructure
  • Business / Travel
  • Sports
  • Letter
  • Contact Us
News
Home›News›JUST IN: Speedboats to operate all night from Stabroek to Vreed-en-hoop

JUST IN: Speedboats to operate all night from Stabroek to Vreed-en-hoop

By Leroy Smith
20 November 2021
316
0
Share:

 

To facilitate the proposed six hours closure of the Demerara Harbour Bridge to vehicular traffic tonight (Saturday, November 20, 2021), speedboats will be allowed the ply the Stabroek to Vreed-en-hoop route all night.

According to an advisory from the DHB, “during the closure…water taxi will be operating from Georgetown stelling to Vreed-en-hoop stelling throughout the night.”

The Harbour bridge will be closed to facilitate repairs to the retractor spans from midnight to 6:00h on Sunday. The bridge linking Regions Three and Four was also closed for the same period on Saturday to undertake works.

In a recent notice, the DHB said the Retractor Spans 9 &10, which are retracted daily for sea-going vessels, is the most critical section of the bridge which absorbs the most wear and tear.

It noted that earlier this year, a contract was awarded to Industrial Fabrications Inc. (InFab) for the design, fabrication and installation of Retractor Span 9. The company has since completed their offsite design and fabrication works and is now ready to work onsite i.e., to remove and replace damaged components.

The DHB management further stated that it will be extremely unsafe to commute during this time.

According to the Notice, “the general objective of the Rehabilitation project is to restore the retractor spans by eliminating the existing structural deficiencies and reconstruct retractor span 9 so as to improve the bridge’s condition, geometrics, safety, and load-carrying capacity.”

While the management noted that it is conscious of the inconvenience this closure will cause to commuters, it stated that “in the interest of safety, Spans 9 and 10 have to be rehabilitated without delay.”

Share on Facebook Share
Share on TwitterTweet
Share on Pinterest Share
Share on LinkedIn Share
Share on Digg Share
Previous Article

Eve Leary fire, a set back but ...

Next Article

Saturday’s fire brings headache for DPP chambers

0
Shares
  • 0
  • +
  • 0
  • 0
  • 0
  • 0

Related articles More from author

  • News

    Chief Justice sets Jan. 20 to hear arguments in Unions challenge against Govt’s COVID-19 measures

    18 November 2021
    By Leroy Smith
  • News

    Nail technician charged for sharing explicit info about relatives on social media

    19 April 2021
    By Leroy Smith
  • Crime / Security

    Driver Charged in Fatal Mon Repos Accident

    16 July 2024
    By Savitri Laikram
  • News

    COVID-19 vaccine drive off to good start in Essequibo

    2 September 2021
    By Leroy Smith
  • Crime / Security

    ‘Bobin’ Charged with Break and Enter, Larceny

    4 July 2025
    By Savitri Laikram
  • News

    Government’s Home Mortgage Initiative Guides Timehri Residents Towards Homeownership

    11 June 2024
    By Savitri Laikram

You may interested

  • Community ReportFeaturesNewsVideos

    Agriculture Minister Commissions New Projects to Boost Berbice Farming Community

  • News

    E’bo farmers to benefit from flood relief today; 78% more to benefit on revised list.

  • News

    Olympus Kennels Dog Show and Expo 2024 a hit among dog lovers.

Connect Us

  • Envato
  • 279.3K+
    Likes
  • 4.5K+
    Followers
  • Subscribers
  • Followers
  • Subscribe
    RSS Feeds

Latest News

Crime / SecurityNews

Opposition Leader, Police constable remanded over cybercrime charge

October 30 2026   Opposition Leader Azruddin Mohamed and a 20-year-old police constable were on Friday remanded to prison after being jointly charged with the unauthorised giving of electronic data ...
  • GPL points to foul play in widespread blackout today

    By Savitri Laikram
    30 October 2026
  • Jagdeo, UK Foreign Secretary hold talks on climate action, forest conservation

    By Savitri Laikram
    30 October 2026
  • GDF, Police make strong start to 2026/ 27 campaign in Women’s D1 League

    By Tristan J
    29 October 2026
  • Regional titles decided as ExxonMobil U18 Championships continue October 30 and 31

    By Tristan J
    29 October 2026

FeedBurner Widget

Sign up to receive email updates and to hear what's going on with our magazine!

About US

logo

BIG Smith News Watch was established in 2015 and is recognized by the Guyana press Association as a legitimate media outlet in Guyana. Our operation focuses more community, human interest and developmental issues. We also do focus on matters of crime, security, business, politics and current affairs. The entity is headed by Leroy Smith, a practicing journalist with experience in news gathering, reporting and coverage spanning seventeen years. Mr. Smith joined the media 2005 and worked at several media housing before launching BIG Smith News Watch in 2015.

  • +592-705-8780
  • bigsmithnewswatch35@gmail.com
  • Popular Posts

  • Lance Corporal dies days after fight with police sergeant

    By Leroy Smith
    8 May 2019
  • Nonummy suspendisse hendrerit ultrices

    By DesignUTD
    26 August 2015
  • 21 Year Old mechanic busted with cocaine pellets in hotel room

    By Leroy Smith
    27 April 2019
  • Bandit shows up to robbery with ‘one bullet’; shot dead by security guard

    By Leroy Smith
    30 April 2019

Follow us

© Copyright www.bigsmithnewswatch.news. All rights reserved.